none
none
none
none
Latest Active Tenders | Tenders by Closing Date | Corrigendum | Results of Tenders | Contacts | Feedback
Home
Latest Active Tenders
Tenders by Closing Date
Closing Today  
Closing within 7 days  
Closing within 14 days  
Corrigendum
  Tender Notices / Displays  
  Tender Related Links  
     
Tenders by Classification
Buy  
Works Contract  
Service Contract  
Sell  
Auction  
Empanelment/Registration  
By Products/Services
Civil Works, Equipments, Machinery, Support
Services...
 
Tenders by Agency
Department  
HODs / Directorates  
Undertakings / Boards  
Local Bodies  
Statutory Organisations  
Search
Tenders by Location  
Tenders by Description  
Advanced Search  
Tenders by Value  
Tenders by ID/Ref No.  
Tenders Related Links
  Feedback
 

Official website of Government of Tamil Nadu
The National Portal of India
The Indian Government Tenders Portal
 
 

Tenders of : Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
 
S. No. Closing Date Title / Ref. No. Dept/ Orgn Name
1 31-Dec-2019 Supplying, conveying, laying and jointing 200 mm dia DI pipes for a length of 23 Km. and 14 Km. for conveying 2 MLD TTRO water each from the existing Sriperumbudur SIPCOT SEZ
CNT/WSS/NCB/DEP/3229/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
2 3-Jan-2020 Constructions of 12 nos of 110 mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 3
CNT/LT/WSS/SDRF/071A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
3 3-Jan-2020 Constructions of 09nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 15
CNT/LT/WSS/SDRF/083A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
4 3-Jan-2020 Constructions of 16nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 10
CNT/LT/WSS/SDRF/078A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
5 3-Jan-2020 Constructions of 13 nos of 110mm dia observation borewells for fixing Ground water level indicators and related instruments in Area 13
CNT/LT/WSS/SDRF/081A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
6 3-Jan-2020 Constructions of 18nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 9
CNT/LT/WSS/SDRF/077A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
7 3-Jan-2020 Constructions of 15nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 8.
CNT/LT/WSS/SDRF/076A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
8 3-Jan-2020 Constructions of 15nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 5.
CNT/LT/WSS/SDRF/073A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
9 3-Jan-2020 Constructions of 13nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 11
CNT/LT/WSS/SDRF/079A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
10 7-Jan-2020 Outsourcing of operation and Maintenance of Mogappair HT 3 shift sewage pumping station Area VII
CNT/SEW/MWB/3122/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
11 7-Jan-2020 Operation and Maintenance of LT2 shifts RV Nagar sewage pumping station in Area VIII
CNT/SEW/MWB/3123/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
12 7-Jan-2020 Operation and Maintenance of LT2 shifts Dr Ambethkar Nagar sewage pumping station in Area VIII
CNT/SEW/MWB/3124/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
13 7-Jan-2020 Operation and Maintenance of NSK Nagar LT2 shifts sewage pumping station in, Area VIII
CNT/SEW/MWB/3125/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
14 7-Jan-2020 Operation and Maintenance of Gandhi Nagar LT2 shifts sewage pumping station in, Area VIII
CNT/SEW/MWB/3126/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
15 7-Jan-2020 Operation and Maintenance of Anna Nagar B HT 3 relay Thiruvallur Nagar LT3 Shift Sastri Nagar LT 3 shifts sewage pumping station Area VIII
CNT/SEW/MWB/3127/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
16 7-Jan-2020 Outsourcing of operation and Maintenance of North Mylapore HT3 TSPark LT3 shift Thomas Road LT3 shift Krishnammal Road side sewage pumping station Anbu Colony Road side and GN
CNT/SEW/MWB/3129/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
17 7-Jan-2020 Outsourcing of operation and Maintenance of Greams Road HT3 shifts South Mylapore HT3 shifts Karneeswarar Pakoda Street LT 3 shift Independence Day park LT2 shift and Kumarap
CNT/SEW/MWB/3128/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
18 7-Jan-2020 Outsourcing of operation and Maintenance of Ice House HT3 shift Amudham Colony LT2 shift relay Nandanam LT3 Shift and Seethammal Colony LT3 shift sewage pumping station Area
CNT/SEW/MWB/3130/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
19 7-Jan-2020 Providing Reinforcement cement concrete road in the Mogappair West and Kallikuppam filling points of Area VII
CNT WSS MWB 3230 2019 20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
20 8-Jan-2020 Outsourcing of Operation and Maintenance of Puliyaurpuram LT 2 shifts sewage pumping stations
CNT/SEW/MWB/3131/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
21 8-Jan-2020 Outsourcing of Operation and Maintenance of Giriappa LT 2shifts sewage pumping stations
CNT/SEW/MWB/3132/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
22 8-Jan-2020 Outsourcing of Operation and Maintenance of Namachivayapuram LT 2 shifts sewage pumping stations
CNT/SEW/MWB/3133/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
23 8-Jan-2020 Outsourcing of Operation and Maintenance of Mandavelipakkam LT 2 shifts sewage pumping stations
CNT/SEW/MWB/3134/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
24 8-Jan-2020 OOutsourcing of Operation and Maintenance of CIT Nagar HT3shifts LT 2 shifts pumping stations Kodambakkam and Saidapet B HT 3 shifts.
CNT/SEW/MWB/3135/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
25 8-Jan-2020 Outsourcing of Operation and Maintenance of West Arumbakkam HT 3 shifts sewage pumping station Gothamedu LT 2 shifts sewage pumping station Gandhi Nagar LT 2 shifts Sewage pum
CNT/SEW/MWB/3136/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
26 8-Jan-2020 Outsourcing of Operation and Maintenance of Saidapet A LT 3 shifts sewage pumping stations Jaffarkhanpet LT 2 shifts sewage pumping stations
CNT/SEW/MWB/3137/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
27 8-Jan-2020 Outsourcing of Operation and Maintenance of Bharathidasan Colony LT 2,shifts sewage pumping stations Sathya Murthy Block LT 2 sewage pumping stations and Thiru Nagar LT 2 shif
CNT/SEW/MWB/3138/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
28 8-Jan-2020 Outsourcing of operation and Maintenance of KK Nagar B LT 3 shifts sewage pumping station, Ashok Nagar LT 3 shifts sewage pumping station and Jai Balaji Nagar LT 3 shifts s
CNT/SEW/MWB/3139/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
29 8-Jan-2020 Outsourcing and Operation and Maintenance of Saigramam HT 3 Shifts sewage pumping station, Virugambakkasm LT 3 shifts sewage station and sarathy Nagar LT 2 shifts sewage pumpi
CNT/SEW/MWB/3140/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
30 9-Jan-2020 Outsourcing of Operation and Maintenance of Southern Head works HT 3 shifts for 3 years Area IX
CNT/WSS/MWB/3141/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
31 9-Jan-2020 Outsourcing of Operation and Maintenance of KK Nagar New Water Distribution Station HT 3 Shifts Sewage Pumping Station
CNT/WSS/MWB/3142/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
32 9-Jan-2020 Outsourcing of Operation and Maintenance of Adyar HT Relay Dr Seethapathy Nagar LT 3 Shifts and Thanthai Periyar Nagar LT 3 Shifts Sewage Pumping Station for three years in Ar
CNT/SEW/MWB/3143/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
33 9-Jan-2020 Outsourcing of Operation and Maintenance of AGS Colony LT 3 Shifts BV Nagar LT 3 Shifts and Pallipattu LT 3 Shifts Sewage Pumping Stations for three years in Area 13
CNT/SEW/MWB/3144/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
34 9-Jan-2020 Outsourcing of Operation and Maintenance of Ekkattuthangal HT 3 Shifts Murugu Nagar LT 3 Shifts and SIDCO Lift Lt 2 Shifts Sewage Pumping Stations in Area 13 for 3 years
CNT/SEW/MWB/3145/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
35 9-Jan-2020 Outsourcing of Operation and Maintenance of Gandhi Nagar HT 3 Shifts Saidapet D HT 3 shifts and Taramani LT 3 shifts Sewage Pumping Station for 3 years in Area 13
CNT/SEW/MWB/3146/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
36 9-Jan-2020 Outsourcing of Operation and Maintenance of Guindy HT 3 shifts SKP Puram LT 2 Shifts Foreshore Estate LT 2 shifts
CNT/SEW/MWB/3147/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
37 9-Jan-2020 Outsourcing of Operation and Maintenance of Indira Nagar HT 3 shifts PTC Colony LT 3 Shifts and Kalachetra Colony LT 3 Shifts Sewage Pumping Stations for 3 years in Area 13
CNT/SEW/MWB/3148/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
38 9-Jan-2020 Outsourcing the Operation and Maintenance of LIC Colony HT Relay, Kotturpuram HT 3 shifts and Bhiramin Street LT 2 shifts Sewage Pumping Station for three years in Area 1
CNT/SEW/MWB/3149/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
39 9-Jan-2020 Outsourcing of Operation and Maintenance of Velachery HT 3 shifts Orandiamman Kovil Street LT 3 shifts and Govindaswamy Nagar LT 2 shifts sewage pumping stations for three yea
CNT/SEW/MWB/3150/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
40 10-Jan-2020 Outsourcing of operation and Maintenance of South Dimmasamy Darga and Sivananda Nagar LT 2 Shift sewage pumping station
CNT/SEW/MWB/3151/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
41 10-Jan-2020 Outsourcing of operation and Maintenance of Jawahar nagar Periyar Nagar and Kennedy Square LT3 Shift sewage pumping station
CNT/SEW/MWB/3152/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
42 10-Jan-2020 Outsourcing of operation and Maintenance of Ekangipuram Venkatesapuram and Sembium LT3 Shift sewage pumping station
CNT/SEW/MWB/3153/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
43 10-Jan-2020 Outsourcing of operation and Maintenance of Nammalwarpet HT3 KP Park LT3 in Area VI Bank Colony LT3 in Area III and reserve Bank LT2 in Area V sewage pumping station
CNT/SEW/MWB/3154/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
44 10-Jan-2020 Outsourcing of operation and Maintenance of Kilpauk HT 3 shift North Jaganatha Nagar LT 3 shifts and P P Garden LT 2 shift sewage pumping station
CNT/SEW/MWB/3155/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
45 10-Jan-2020 Outsourcing the Operation and Maintenance of Sewage Pumping Stations for three years at Periyar salai LT3
CNT/SEW/MWB/3157/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
46 10-Jan-2020 Outsourcing of operation and Maintenance of Anna Nagar A HT 3 shift Shenoy Nagar HT 3 Shifts and Chetpat LT 3 shift sewage pumping station
CNT/SEW/MWB/3158/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
47 10-Jan-2020 Outsourcing of operation and Maintenance of Villivakkam Phase I LT 3 shifts Villivakkam Phase II Villivakkam sector B LT 3 shifts and Bharathipuram LT 2 sewage pumping statio
CNT/SEW/MWB/3159/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
48 10-Jan-2020 Outsourcing of operation and Maintenance of Parthasarathy LT 3 shift sewage pumping stations
CNT/SEW/MWB/3160/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
49 10-Jan-2020 PhaseI Package38 Supplying and Laying of 400 mm dia CI Sewage Pumping Main from West Mada Street Sewage Pumping station to South Mada Sewage Pumping Station in Area I
CNT/SEW/CRRT/PHASE-I/072/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
50 10-Jan-2020 Providing 30 KVA Acoustic Enclosed Deisel Generator and its allied works at Thillai Ganga Nagar HW in Area XII
CNT/LT/WSS/MWB/060A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
51 10-Jan-2020 Supply and delivery of 22 Nos. of Desilting Machines mounted on 4 wheeler for sewer maintenance.
MAT/OT/052/2019 Dated 23.12.2019 due on 10.01.202
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
52 10-Jan-2020 Supply and delivery of Computer Consumables on Annual Rate Contract basis for the year 2020 - 2021.
MAT/OT/051/2019 dt.23.12.2019 due on 10.01.2020
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
53 10-Jan-2020 Supply and delivery of Sodium Hypochlorite Solution conforming to IS Specification No.11673 to its Latest Revision (Available chlorine must be 5.5 pc to 6.0 pc) on ARC Basis.
MAT/OT/053/2019 dt.23.12.2019 due on 10.01.2020

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
54 14-Jan-2020 Outsourcing of Operation and Maintenance of LT 3 shifs day Killijocium Nagar LT3 Perimattupalayam Sadayankuppam pattai and KR Ramasamy Nagar LT2 sewage pumping stations meeti
CNT/SEW/MWB/3161/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
55 14-Jan-2020 Outsourcing of Operation and Maintenance of Sewage Pumping Stations for three years at West Mada South Mada LT3 and Manali New Town LT3 in Area II meeting all the statutory r
CNT/SEW/MWB/3162/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
56 14-Jan-2020 Outsourcing of Operation and Maintenance of for three years at Erukkenchery HT3 shifts Relay Sewage Pumping Station
CNT/SEW/MWB/3163/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
57 14-Jan-2020 Outsourcing of Operation and Maintenance of Ayothikuppam LT2 shifts Sewage Pumping Stations in Area IX
CNT/SEW/MWB/3164/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
58 14-Jan-2020 Outsourcing of Operation and Maintenance of Ram Nagar LT2 Sewage Pumping Stations for three years in Area IX
CNT/SEW/MWB/3165/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
59 14-Jan-2020 Outsourcing of Operation and Maintenance of Pallakumaniyam LT2 shifts Sewage Pumping Station in Area IX
CNT/SEW/MWB/3166/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
60 14-Jan-2020 Outsourcing of Operation and Maintenance of T.Nagar HT 3 Sewage Pumping Station in Area X
CNT/SEW/MWB/3167/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
61 14-Jan-2020 Outsourcing of Operation and Maintenance of Thanickachalam nagar LT2 WDS in Area III Nochikuppam RO Plant LT2 Area IX SBI colony WDS Netahaji street HW and Nandambakkam LT3 XI
CNT/WSS/MWB/3168/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
62 14-Jan-2020 Outsourcing of Operation and Maintenance of Naganallur 29th street OHT Balaji Nagar OHT Eswaren colony OHT Lakhsmi nagar OHT for three years in Area XII
CNT/WSS/MWB/3170/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
63 14-Jan-2020 Outsourcing of Operation and Maintenance of Nilamangai Nagar HT3 Sewage Pumping Station for three years in Area XII
CNT/SEW/MWB/3169/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
64 21-Jan-2020 Outsourcing of Operation and Maintenance of LB road HT 3 Ralay in Area XIV and Kannaki Nagar LT 3 shifts and Ezhil Nagar LT3 shifts sewage pumping stations for three years in
CNT/SEW/MWB/3180/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
65 21-Jan-2020 Outsourcing of Operation and Maintenance of newly completed water distribution station, Usha Nagar LT 2 Shift HW, Balaji Nagar LT 2 Shift HW, Anna Salai LT 2 Shift HW and MG N
CNT/WSS/MWB/3182/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
66 21-Jan-2020 O and M of newly commissioned SPS,AGS Colony LT3 shift SPS,Ravanan Nagar LT2 shift SPS,Dhrowpathy amman kovil street LT2 shift SPS under UllagaramPuzhuthivakkamScheme for 3Yrs
CNT/SEW/MWB/3181/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
67 21-Jan-2020 Outsourcing the Operation and Maintenance of sewage pumping stations of the following locations for three years Korattur Old and New Elango Nagar and Osangulam
CNT/SEW/MWB/3171/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
68 21-Jan-2020 Outsourcing the Operation and Maintenance of sewage pumping stations of the following locations for three years Nolambur PhaseI Ganga Nagar CMDA colony Nagar
CNT/SEW/MWB/3172/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
69 21-Jan-2020 Outsourcing the Operation and Maintenance of sewage pumping stations of the following locations for three years Thiru Nagar Meenakshi Nagar Ramakrishna Nagar SPS
CNT/SEW/MWB/3173/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
70 21-Jan-2020 Outsourcing the Operation and Maintenance of water distribution station Head works of the following locations for three years Thillai Ganga Nagar Nehru Nedunchalai Kannan Colo
CNT/WSS/MWB/3174/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
71 21-Jan-2020 Outsourcing the Operation and Maintenance of Alandur New St OHT KK Nagar OHT Adambakkam Gate OHT and Parthasarathy Nagar OHT for 3years Area XII
CNT/WSS/MWB/3175/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
72 21-Jan-2020 Outsourcing the Operation and Maintenance of MRC Nagar Mylapore and Nandanam Water Distribution station HT 3 Shifts for 3years in Area XIII
CNT/WSS/MWB/3176/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
73 21-Jan-2020 Outsourcing the Operation and Maintenance of 512HIG LT 3Shifts and Lakshmi Nagar LT 3 shifts Sewage pumping station for 3years in Area XIII
CNT/SEW/MWB/3177/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
74 21-Jan-2020 Outsourcing the Operation and Maintenance of Ekkattuthangal HT 3 Shifts Murugu Nagar LT 3 Shifts and Sidco Lift LT 2 shifts sewage pumping stations for 3years in area XIII
CNT/SEW/MWB/3178/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
75 21-Jan-2020 Outsourcing the Operation and Maintenance of Periyar Nagar LT3 shifts Velachery SectorV LT3 Shifts and Saidapet C LT3Shifts sewage pumping stations for 3years in Area XIII
CNT/SEW/MWB/3179/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
76 21-Jan-2020 Phasel Package24 Enlargement of 300 mm dia CI pumping main by 500mm dia CI pumping main from Tondiarpet C pumping station to Tondiarpet B sewage pumping station in AreaV
CNT/SEW/CRRT/PHASEI/058B/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
77 21-Jan-2020 Balance works under the work of enlargement of sewer mains of sizes 200 mm dia SW, 250 mm dia SW and 300 mm dia CI and Construction of manholes at various locations in Div 35
CNT/SEW/IA/PHASE-I/3223A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
78 21-Jan-2020 Phase-I- Package-28 Laying of Inteceptor and Diversion for Plugging of Sewage Outfalls in Nolambur Drain from CH 2120 to Mogappair SPS
CNT/SEW/CRRT/PHASE-I/066A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
79 21-Jan-2020 Balance works under the work of providing comprehensive water supply scheme to Madhavaram Municipality MGR Nagar Zone 7 ,Package VI
CNT/WSS/GoTN/3071D/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
80 21-Jan-2020 Providing comprehensive sewerage scheme to Pallikaranai with Manhole raising works including cleaning of manholes conducting flow test and gap work for laying of Sewers Zone 1
CNT/SEW/JNNURM/165A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
81 21-Jan-2020 Providing comprehensive sewerage scheme to Pallikaranai with Manhole raising works including cleaning of manholes conducting flow test and gap work for laying of Sewers Zone 2
CNT/ SEW/ JNNURM/166A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
82 21-Jan-2020 Providing comprehensive sewerage scheme to Pallikaranai with Manhole raising works including cleaning of manholes conducting flow test and gap work for laying of Sewers Zone 3
CNT/ SEW/JNNURM/167A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
83 21-Jan-2020 Providing comprehensive sewerage scheme to Pallikaranai with Manhole raising works including cleaning of manholes conducting flow test and gap work for laying of Sewers Zone 4
CNT/ SEW/JNNURM/168A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
84 22-Jan-2020 Outsourcing of operation and Maintenance of HT3 Kadappa road Terminal Sewage pumping station
CNT/SEW/MWB/3183/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
85 22-Jan-2020 Outsourcing of operation and Maintenance of LT-3 Thangal Karai Pumping station and Madhanakuppam and Road side Pumping stations at Puthagaram sewage pumping station
CNT/SEW/MWB/3184/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
86 22-Jan-2020 Outsourcing of operation and Maintenance of LT3 Pumping stations at Thanikachalam Nagar, Chandraprabhu colony and Ramachandra Nagar sewage pumping station
CNT/SEW/MWB/3185/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
87 22-Jan-2020 Outsourcing of operation and Maintenance of LT3 Pumping stations at Mathur MMDA in AreaII, Metha Nagar and Muthumariamman sewage pumping station
CNT/SEW/MWB/3186/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
88 22-Jan-2020 Outsourcing of operation and Maintenance of LT2 pumping station at Padmavathy Nagar and Rajiv Gandhi Nagar pumping station
CNT/SEW/MWB/3187/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
89 22-Jan-2020 Outsourcing of operation and Maintenance of Nesapakkam HT3 shifts pumping stations
CNT/SEW/MWB/3188/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
90 22-Jan-2020 Balance works under the work of enlargement of sewer main in Division 111 of Area IX under Plugging of sewage outfalls in Chennai city water ways in Phase I Package V
CNT/SEW/NCB/IA/3227A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
91 22-Jan-2020 Balance works under the work of laying of pumping main from North Mylapore Pumping Station to Adyar Pumping Station in Division 126 of Area IX under Plugging of sewage outfall
CNT/SEW/NCB/IA/3228A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
92 23-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping station in Ramakrishna Nagar and Road side shift Pumping station in Raja Shanmugam Nagar
CNT/SEW/MWB/3189/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
93 23-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping station in Ramasamy Nagar and Road side shift Pumping station in Thiruvetti Amman Koil Street
CNT/SEW/MWB/3190/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
94 23-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping station in Bharathiyar Nagar and Road side shift Pumping station in Ellaiamman Koil of Thilagar Nagar
CNT/SEW/MWB/3191/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
95 23-Jan-2020 Outsourcing of Operation and Maintenance of LT3 shift pumping station in Neithal Nagar, Jai Hind Nagar
CNT/SEW/MWB/3209/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
96 23-Jan-2020 Outsourcing of Operation and Maintenance of HT3 shift or day pumping station in Kamalandal Nagar 3 and pumping station in Thatan Kuppam LT3
CNT/SEW/MWB/3210/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
97 23-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping station in Nehru Nagar , Road side shift Pumping station in Anna Nagar and Road side shift Pumping station in Periya Kuppam
CNT/SEW/MWB/3211/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
98 23-Jan-2020 Outsourcing of Operation and Maintenance of HT3 shift or day pumping station in Subramanian pond and Basin Road HT3 shift and Annai Sivagami Nagar LT3
CNT/SEW/MWB/3212/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
99 23-Jan-2020 Outsourcing of Operation and Maintenance of Kathivakkam and Thalankuppam HeadWorks
CNT/WSS/MWB/3213/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
100 23-Jan-2020 Package I Balance works under providing comprehensive sewerage scheme to Pallikaranai with collection system, pumping station, pumping main, allied electrical works and trench
CNT/SEW/NCB/JNNURM/164A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
101 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at VOC Nagar, Pachaikal Veerasamy
CNT/SEW/MWB/3214/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
102 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at AlagiriNagar, Srinivasanagar in Area X
CNT/SEW/MWB/3215/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
103 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at VOC Nagar, Annai Sathya Nagar in Area X
CNT/SEW/MWB/3216/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
104 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at Samiayarthottam, Abith colony in Area X.
CNT/SEW/MWB/3217/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
105 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at BarathiNagar,Valluvar Nagar in Area XIII.
CNT/SEW/MWB/3218/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
106 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at Kanagam and Rajaji Nagar in Area XIII.
CNT/SEW/MWB/3219/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
107 24-Jan-2020 Outsourcing of Operation and Maintenance of Road side shift pumping stations for three years at Imayamcolony, S.M.Narayana Nagar, Bharathisalai Reddipalayam Lift station in A8
CNT/SEW/MWB/3220/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
108 24-Jan-2020 Constructions of 15nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 8.
CNT/LT/WSS/SDRF/076B/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
109 24-Jan-2020 Constructions of 12 nos of 110 mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 3
CNT/LT/WSS/SDRF/071B/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
110 24-Jan-2020 Constructions of 15nos of 110mm dia observation borewells depot wise for fixing Ground water level indicators and related instruments in Area 5.
CNT/LT/WSS/SDRF/073B/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
111 28-Jan-2020 Outsourcing of Operation and Maintenance of Tondiarpet D SPS HT 3 shift, R K Nagar South LT 3 Shifts SPS and Kadumpadi Amman Koil street LT 3 Shifts Sewage Pumping Station in Area IV
CNT/SEW/MWB/3112/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
112 28-Jan-2020 Outsourcing of Operation and Maintenance of R K Nagar North - HT 3 Shifts Sewage Pumping Station
CNT/SEW/MWB/3113/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
113 28-Jan-2020 Outsourcing of Operation and Maintenance of Tondiarpet F New HT 3 Shifts relay, Thendral Nagar SPS LT 3 Shift and Poongavanam Nagar LT Shift for 3 years in Area IV
CNT/SEW/MWB/3114/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
114 28-Jan-2020 Outsourcing of Operation and Maintenance of Tondiarpet A HT 3 Shifts SPS, RR Nagar SPS LT 2 Shifts, Bharathi Nagar LT 2 Shifts SPS in Area IV and Chettithotam LT 2 Shifts SPS in Area V sewage pumping station
CNT/SEW/MWB/3115/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
115 28-Jan-2020 Outsourcing of Operation and Maintenance for CB road SPS HT 3 Shifts, TV Nagar SPS LT 3 Shifts and Kamarajar Salai LT 3 Shifts sewage pumping station in Area IV
CNT/SEW/MWB/3116/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
116 28-Jan-2020 Outsourcing of Operation and Maintenance for KKD HT 3 Shift SPS, Nehru Nagar LT 3 Shifts SPS and KB4 LT 3 Shifts sewage pumping station in Area IV
CNT/SEW/MWB/3117/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
117 28-Jan-2020 Outsourcing of Operation and Maintenance of Muthamizh Nagar HT 3 Shifts sewage pumping station in Area IV
CNT/SEW/MWB/3118/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
118 28-Jan-2020 Outsourcing of Operation and Maintenance of Tondiarpet E HT 3 Shifts SPS, Kasimedu SPS LT 3 Shifts, and DBK Street LT 3 Shifts sewage pumping station in Area IV
CNT/SEW/MWB/3119/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
119 28-Jan-2020 Outsourcing of operation and Maintenance of 4Nos of pumping stations East Cemetry Road, Muthamizh Nagar Bajaraja Nagar and stanley and 1 nos of malayappan street LT 3 shift
CNT/SEW/MWB/3120/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
120 28-Jan-2020 Outsourcing of operation and Maintenance of 4Nos. of SPS of LT 2 shift at Navalar Nagar, Sathyavani nagar, Muthu Nagar, Meenambal Sivaraj Nagar and 1 nos of Border thottam
CNT/SEW/MWB/3121/2019-20

Corrigendum available
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
121 28-Jan-2020 Phase I Package 26 Enlargement of 250mm dia CI pumping main by 600mmdia CI pumping main from Malayappan street pumping station to Northwall road sewage pumping station in A
CNT/SEW/CRRT/PHASE-I/060A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
122 28-Jan-2020 Phase 1 Package 35 Enlargement of existing 400mm dia CI Pumping main to 600mm CI pumping main from Saidapet A to junction of Govindan Street and enlargement of existing 525mm
CNT/SEW/NCB/CRRT/PHASE I/ 069/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
123 28-Jan-2020 Phase-I - Package-37 - Replacement of two nos. of old Sewage pumping mains with 2nos of 1000mm dia CI Pumping mains from Purasawalkam Sewage Pumping Station to Kodungaiyur STP
CNT/SEW/NCB/CRRT/PHASE I/071/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
124 28-Jan-2020 Phase I Package 36 Replacement of Existing 1600 mm dia PSC Sewage pumping main with 2 Nos of 1000 mm Dia CI Pipe from Adyar Bridge to junction of Madhya Kailash at Sardar Pa
CNT/SEW/NCB/CRRT/PHASE I/070/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
125 28-Jan-2020 Phase I Package 31 Providing 400 mm dia Pumping main from Greams Road Pumping Station to Langs Garden Sewage Pumping Station in Area IX
CNT/SEW/CRRT/Phase I/063A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
126 29-Jan-2020 Phase 1 Package 25 Supply and laying of 750mm dia CI force main from Tondiarpet B pumping station to Tondiarpet F New sewage pumping station in Area 5
CNT/SEW/NCB/CRRT/ Phase-I /059A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
127 29-Jan-2020 Phase 1 Package 22 Replacement and rerouting of 600mm dia PSC sewage pumping main from Flowers Road to Purasaiwalkam SPS in Area VIII
CNT/SEW/NCB/CRRT/ Phase-I/056A/2019-20
Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Number of Tenders : 127

 


Contents owned and maintained by
concerned Departments in coordination with Finance Department and
Information Technology Department,
Government of Tamil Nadu

Site best viewed in 1024 x 768 pixels

Disclaimer

Designed, Developed and Hosted by
National Informatics Centre
Email :
etender@tn.nic.in
( c )  National Informatics Centre